Congress to State Dept: We Want All Your Stuff on New London Embassy Except Paperclips

— Domani Spero
[twitter-follow screen_name=’Diplopundit’ ]

 

We recently blogged about the congressional hearing on the new embassy construction (see New Embassy Construction Hearing: Witnesses Not Invited, and What About the Blast-Proof Glass?).  Well, a couple of weeks ago, the  House Oversight and Government Reform Committee sent a letter to Secretary Kerry asking for documents and information on the new embassy construction.  Presumably in preparation for the hearing.  Almost half of the docs requested were related to the New London Embassy.  Did not look like the Committee got the docs that they wanted in time for the hearing.  In any case, below is a partial list; it looks like they wanted everything including drafts and all, except paperclips.

Giant paper clip at BI Commercial College near...

Giant paper clip at BI Commercial College near Oslo (Photo credit: Wikipedia)

We must say that the HOGR has not been short on its version of HPD … way too much emotion and drama that draws attention to themselves and the nearest camera for our taste.  Really, if they just do their jobs without too much theatrics, our institutions would be a lot better for it.  Having said that, it’s the only Congress we’ve got and they have an oversight role to play even if more than one in five Americans (22%) are ready to start over entirely after all members are fired.  For now, we’re stuck with these folks.  Luckily for us, not all of them will stay in Congress for life. So — please give these angry folks the documents they need even if they occasionally drive you nuts; they may not be there next year. They want a cost/benefit analysis, give it to them, too. We suspect the analysis would be useful anyways, and these folks would have to write their own scripts on what to say on teevee.

Oh hey, they want to know about the blast testing of the curtain wall, so do we!

 

20.   All Action Memoranda and Information Memoranda, including drafts, referring or relating to the New Embassy Compound in London, United Kingdom.

21.   All documents referring or relating to Value Engineering Studies relating to the New Embassy Compound in London, United Kingdom, including all versions of any Value Engineering Studies.

22.   All documents and communications relating to changes and notices to proceed relating to the New Embassy Compound in London, United Kingdom, including, but not limited to, all such communications with: a) KieranTimberlake Architects; b) B.L. Harbert International;  and, c) Weidlinger and Associates.

23.   All documents referring or relating to congressional Construction Security Certification for the New Embassy Compound in London, United Kingdom, including, but not limited to, all communications with the Office of the Director of National Intelligence.

24.   All documents and communications referring or relating to Value Added Tax (VAT) relating to the New Embassy Compound in London, United Kingdom.

25.   All documents and communications referring or relating to blast testing of the curtain wall, and curtain wall components, of the New Embassy Compound in London, United Kingdom, including, but not limited to, all such communications with: a) the Bureau of Diplomatic Security; b) KieranTimberlake Architects; c) B.L. Harbert International; d) Weidlinger and Associates.

26.   All documents and communications referring or relating to the application of General Services Administration (GSA) Performance Conditions to blast testing of the curtain wall, and curtain wall components, of the New Embassy Compound in London, United Kingdom, including, but not limited to, communications between OBO and the Bureau of Diplomatic Security.

27.   All documents and communications relating to the engineering and legal justifications for applying standards other than those of the Bureau of Diplomatic Security to blast testing of the curtain wall, and curtain wall components, of the New Embassy Compound in London, United Kingdom.

28.   A document identifying all State Department overseas properties, the physical security of which were designed, tested or certified to GSA standards.

29.   All documents and communications relating to the decision to conduct blast testing of the curtain wall, and curtain wall components, of the New Embassy Compound in London, United Kingdom, in both Ft. Polk, Louisiana and Socorro, New Mexico.

30.   The U.S. Army Engineer Research and Development Center report relating to blast testing of the curtain wall or curtain wall components, of the New Embassy Compound in London, United Kingdom which occurred in Fort Polk, Louisiana.

31.   All reports prepared for the Committees on Appropriations on the New Embassy Compound in London, United Kingdom which, pursuant to P.L. 112-74, Section 7004 (f)(2), were to be delivered every six months from 60 days after enactment, and which were to include revenue and cost projections, cost containment efforts, project schedule and actual project status, the impact of currency exchange rate fluctuations on project revenue and costs, and options for modifying the scope of the project in the event that proceeds of real property sales in London fall below the total cost of the project.

32.   The estimated cost per square meter to rent office space in the vicinity of the current U.S. Embassy in London, United Kingdom.

33.   All documents related to any lease-back of current U.S. Embassy in London, United Kingdom if the New Embassy Compound in London is not completed on schedule.

 

* * *